Notification

Demonstration case

  • Notification

Demonstration for Obtaining International Classification Society Certi…

페이지 정보

profile_image
작성자 울산태화호
댓글 0 조회 496 작성일 24-03-04 09:31

본문

1. Company: MRC


2. Objective:

- To conduct a performance evaluation for obtaining international classification society certification for the first domestic radar for ship.

- To install the actual radar on the M/V ULSAN TAEHWA and conduct an evaluation for the performance evaluation of the radar.

- To conduct performance evaluations multiple times by installing the radar on the M/V ULSAN TAEHWA for the maritime environment that satisfies IEC 62388:2013.

- To improve the safety of the equipment and increase reliability through updates through the proof of concept of the electronic chart display and information system.


3. Key Features:

□ Equipment Installation Overview

- Installation Date: 2023-06-02

- Installation Location: M/V ULSAN TAEHWA Test Room

- Location Selection Reason: Location provided by M/V ULSAN TAEHWA

 

□ Commercialization Plan

- Promoting equipment through safety/reliability secured through proof of concept and international certification

- Establishing sales strategy by securing references based on proof of concept

- Selling alone by promoting radar and electronic chart display and information system for ship

 

□ Business Promotion Strategy

- Promoting the performance of the actual equipment through the test ship

- Promoting the test results and equipment through domestic and international exhibitions

- Promoting domestic public vessels (domestication of test equipment)


4. Equipment Installed: Shipborne X/S-Band Radar (2ea), Electronic Chart Display and Information System for ship (1ea)

9d65971bc3fa8111a4894f6ba86fce71_1709512296_5026.png
 

5. Results:

- Test Time: Approximately 120 hours

- Summary of Test Results: Obtained international classification society certification for shipborne radar (DNV MED certification)

- Comparison of Actual Results with Planned Results: Conducted performance evaluation of IEC 62388:2013 and improved safety/reliability through proof of concept


5-1. Photos of the Test

9d65971bc3fa8111a4894f6ba86fce71_1709512308_0309.png